BDA vs SPE Fund Comparison
Price, period returns, size, investor count and risk score of BDA (Yapı Kredi Portföy Birinci Katılım Serbest (Döviz-Avro) Fon) and SPE (Azimut Portföy 5.0 Serbest (Döviz) Fon) side by side.
If You Had Invested TRY 10,000
Metric Comparison
| Metric | BDA | SPE | Category median |
|---|---|---|---|
| Daily | 0.08% | −0.12% | −0.07% |
| 1 week | −0.48% | −0.39% | −0.29% |
| 1 month | −0.35% | 0.28% | 0.00% |
| 3 months | 5.84% | 4.95% | 4.33% |
| 6 months | 10.70% | 15.05% | 11.90% |
| YTD | 12.52% | 18.65% | 14.97% |
| 1 year | — | 26.91% | 21.27% |
| 3 years | — | 154.62% | 111.30% |
Popular Comparisons
Popular Fund Comparisons
Related Pages
About the BDA vs SPE Comparison
The price, returns, size and risk of BDA (Yapı Kredi Portföy Birinci Katılım Serbest (Döviz-Avro) Fon) and SPE (Azimut Portföy 5.0 Serbest (Döviz) Fon) are compared side by side as of September 29, 2026. Of the 8 metrics compared, BDA leads in 3 and SPE leads in 5. BDA is a Hedge Fund fund managed by Yapı Kredi Portföy Yönetimi A.Ş.; SPE is a Hedge Fund fund managed by Azimut Portföy Yönetimi A.Ş..
Highlights: Daily: BDA leads (0.08% vs −0.12%). 1 week: SPE leads (−0.39% vs −0.48%). 1 month: SPE leads (0.28% vs −0.35%). 3 months: BDA leads (5.84% vs 4.95%). 6 months: SPE leads (15.05% vs 10.70%). YTD: SPE leads (18.65% vs 12.52%). Size (TRY): BDA leads (4.3B vs 4.3B). Investors: SPE leads (1,021 vs 768).
Frequently Asked Questions
Which earned more, BDA or SPE?
Year to date BDA returned 12.52% and SPE returned 18.65%; over the last year BDA returned — and SPE returned 26.91%. Over the last month BDA returned −0.35% and SPE returned 0.28%. Past performance does not indicate future returns.
Which is larger and which has more investors, BDA or SPE?
As of September 29, 2026, BDA has a size of TRY 4.3B with 768 investors, while SPE has a size of TRY 4.3B with 1,021 investors. BDA leads in size and SPE leads in investor count.
What do the risk scores of BDA and SPE mean?
The CMB risk score of BDA is — out of 7 and that of SPE is —. The risk score reflects the historical volatility of the fund price; 1 is the lowest and 7 the highest risk. A lower score means less volatility, not a guarantee of higher returns.