EDT vs RPT Fund Comparison
Price, period returns, size, investor count and risk score of EDT (Deniz Portföy Ted Eğitime Destek Serbest Fon) and RPT (Rota Portföy İkinci Serbest (TL) Fon) side by side.
If You Had Invested TRY 10,000
Metric Comparison
| Metric | EDT | RPT | Category median |
|---|---|---|---|
| Today (est.) | — | 0.57% | 1.08% |
| Daily | 0.09% | −2.61% | 0.06% |
| 1 week | 0.66% | −2.06% | 0.56% |
| 1 month | 3.02% | 0.21% | 1.84% |
| 3 months | 9.43% | 5.96% | 3.29% |
| 6 months | 20.70% | 16.82% | 7.90% |
| YTD | 37.83% | 33.84% | 17.53% |
| 1 year | 44.85% | 40.82% | 21.48% |
| 3 years | — | 252.73% | 105.66% |
Popular Comparisons
Popular Fund Comparisons
Related Pages
About the EDT vs RPT Comparison
The price, returns, size and risk of EDT (Deniz Portföy Ted Eğitime Destek Serbest Fon) and RPT (Rota Portföy İkinci Serbest (TL) Fon) are compared side by side as of November 12, 2026. Of the 10 metrics compared, EDT leads in 9 and RPT leads in 1. EDT is a Hedge Fund fund managed by Deniz Portföy Yönetimi A.Ş.; RPT is a Hedge Fund fund managed by Rota Portföy Yönetimi A.Ş..
Highlights: Daily: EDT leads (0.09% vs −2.61%). 1 week: EDT leads (0.66% vs −2.06%). 1 month: EDT leads (3.02% vs 0.21%). 3 months: EDT leads (9.43% vs 5.96%). 6 months: EDT leads (20.70% vs 16.82%). YTD: EDT leads (37.83% vs 33.84%). 1 year: EDT leads (44.85% vs 40.82%). Size (TRY): EDT leads (954M vs 932.1M). Investors: EDT leads (522 vs 120). Risk: RPT leads (1 vs 2).
Frequently Asked Questions
Which earned more, EDT or RPT?
Year to date EDT returned 37.83% and RPT returned 33.84%; over the last year EDT returned 44.85% and RPT returned 40.82%. Over the last month EDT returned 3.02% and RPT returned 0.21%. Past performance does not indicate future returns.
Which is larger and which has more investors, EDT or RPT?
As of November 12, 2026, EDT has a size of TRY 954M with 522 investors, while RPT has a size of TRY 932.1M with 120 investors. EDT leads in size and EDT leads in investor count.
What do the risk scores of EDT and RPT mean?
The CMB risk score of EDT is 2 out of 7 and that of RPT is 1. The risk score reflects the historical volatility of the fund price; 1 is the lowest and 7 the highest risk. A lower score means less volatility, not a guarantee of higher returns.